News

Dumpster Dogs Demolition

Dumpster Dogs Demolition – FAQs

1. What types of demolition projects do you handle?

We specialize in full-structure demolitions, including residential homes, commercial buildings, and site clearing. Our services include foundation removal (up to two feet below grade), flatwork removal (sidewalks, driveways, etc.), debris haul-off, and rough grading.

2. How long does the demolition process take?

Most of our demolitions are completed within two days, depending on the size and scope of the project. Factors like weather conditions, permit approvals, and unforeseen obstacles can impact the timeline.

3. Do I need permits for my demolition project?

Yes, obtaining permits is the responsibility of the client. You will need to pull all necessary permits and submit DSHS notifications/fees at least 10 days before demolition. If you need guidance, we’re happy to point you in the right direction.

4. What’s included in your demolition service?

Our standard demolition service includes:
Complete structure demolition (including foundation up to two feet below grade)
Flatwork removal (sidewalks, driveways, etc.)
Haul-off and disposal of all debris/materials
Rough grading of the site

5. What’s NOT included in your demolition service?

🔹 Permits & Fees – You must obtain all necessary approvals.
🔹 Plumbing, Gas, & Electrical Termination – You need to cap plumbing lines, terminate gas lines, and disconnect the electrical meter before demolition.
🔹 Erosion Control & Tree Protection – SWPPP and tree protection measures must be handled by the property owner or general contractor.
🔹 Hazardous Material Testing/Removal – If hazardous materials (asbestos, lead, etc.) are found, separate arrangements must be made for their removal.

6. What additional services do you offer?

We offer optional add-on services, including:

  • Temporary Construction Entrance: Crushed limestone installation – $800
  • Tree & Landscape Removal: Includes a 40-yard dumpster – $4.95 per linear foot
  • Silt Fence Installation (per City of Austin regulations)
  • Triangular Sediment Filter Dike
  • Water & Sewer Capping (Includes a temporary spigot & inspection fees)

7. What happens to salvageable materials?

All salvageable materials (copper, steel, aluminum, etc.) become the property of Dumpster Dogs TX, LLC. If you have specific salvage requests, please let us know before demolition begins.

8. What are my responsibilities before demolition begins?

To ensure a smooth process, you must:
Pull necessary permits and pay required fees
Disconnect utilities (plumbing, gas, electrical)
Ensure SWPPP/erosion control measures are in place
Provide water for dust control

9. Do you offer dumpster rental along with demolition?

Yes! We provide dumpster rental services with next-day delivery guaranteed. Our dumpster sizes range from 10-yard to 40-yard containers, perfect for construction and demolition projects.

10. How do I get a demolition estimate?

Contact us at (512) 962-2586 or email info@ddwaste.com for a free demolition estimate. You can also visit our website at www.ddwaste.com to request a quote.

Dumpster Dogs Demolition – Additional Information

Austin Demolition Permitting Process

1. Do I need a permit for demolition in Austin?
Yes, obtaining a demolition permit is mandatory for all demolition projects within Austin’s jurisdiction. This ensures that the demolition complies with safety and environmental regulations. ​

2. What steps are involved in obtaining a demolition permit in Austin?
The process includes:

3. How long does the permitting process take?
The timeline varies based on project specifics, but it’s advisable to initiate the process well in advance to accommodate reviews and approvals.​

4. Are there fees associated with the demolition permit?
Yes, fees are determined based on the project’s scope and are outlined in the permit application. ​Austin Texas+1Austin Texas+1

LEED Certification and Construction Waste Management

1. What is LEED certification?
LEED (Leadership in Energy and Environmental Design) is a globally recognized certification that signifies a building’s sustainability and environmental performance. ​

2. How does demolition impact LEED certification?
Proper management of demolition waste is crucial for LEED certification. Implementing a Construction and Demolition Waste Management Plan can earn credits by diverting waste from landfills through recycling and reuse. ​fuzionfs.com+5engineeringcivil.org+5leeduser.buildinggreen.com+5

3. What are the requirements for construction waste management under LEED v4.1?
Projects must develop a waste management plan targeting at least five materials for diversion and achieve a minimum 50% diversion rate. ​getgreenbadger.com+3getgreenbadger.com+3fuzionfs.com+3

4. How can Dumpster Dogs assist with LEED certification?
Our team is experienced in sustainable demolition practices and can help develop and implement waste management plans that align with LEED requirements, maximizing waste diversion and supporting your project’s certification goals.​cardellawaste.com

Call me back
[contact-form-7 id="2108" title="Call me back"]